Before installation: A special installation plan should be developed based on the project situation, approved by the technical leader, and the material quality should be checked, the site should be leveled, and drainage measures should be taken.
Precautions for installation and use of scaffolding

Before installation: A special installation plan should be developed based on the project situation, approved by the technical leader, and the material quality should be checked, the site should be leveled, and drainage measures should be taken.
During installation: The verticality of the upright pole, the levelness of the horizontal bar, and the angle of the diagonal brace should meet the requirements. The scaffold board should be fully, evenly, and stably laid, and protective facilities such as guardrails, toe boards, and safety nets should be set up.
Before use: It needs to be jointly inspected by the technical and safety departments, and only after passing the inspection can it be used by hanging the "acceptance certificate". Overloading is strictly prohibited during use. Construction personnel must wear safety protective equipment and stop working in adverse weather conditions.
When dismantling, the principle of "dismantling from top to bottom and layer by layer" should be followed. It is strictly prohibited to work up and down simultaneously. The dismantled components must be transported to the ground and not thrown.

TAG:


Contact Us

Email:services@rcbuildingmaterials.com

Whatsapp:+86 13171994211

Address:Wangyou Village, Hecheng Street Town, Xian County, Cangzhou City, Hebei Province, China

Request Quote

We will contact you within one working day. Please pay attention to your email.

%{tishi_zhanwei}%